If the house needs renovating anyway, it is often the right moment to extend. One combined project means one site, one schedule and far better coherence in both architecture and economy than two separate efforts.

Typical duration: Typically 6–10 months of construction plus permit processing.

We design it as a single move: the new layout is conceived across old and new, and technical systems are sized for the whole house from day one instead of being patched together afterwards.

The project demands the heaviest documentation package of all our project types — building permit, structural design for both new and existing, and a phasing plan that keeps the house liveable as long as possible. That is exactly the complexity our setup is built for.

Permit package The project requires a building permit, and the renovation scope can trigger additional requirements. We combine everything in one permit package.

The package model

Every project is delivered as a package: you choose construction scope (standard rebuild or new layout) and interior package (Essential, Select or Signature) separately. The price is locked in a binding package offer before the design stage starts.

See the full process →